Duty of irrigation water is defined as the area of land irrigated per unit of:

AVolume of rainfall (hectares per mm)
BTotal canal length (km per hectare)
CDischarge (hectares per cumec)
DCrop depth (meters per hectare)
Submitted by: mcqstutor Team 0 comments

Lacey’s regime theory for stable channel design in alluvial soil is applicable when flow is in:

APurely non-scouring supercritical flow
BRigid boundary lined canal
CNon-coherent boundary condition
DTrue regime condition with silt factor f
Submitted by: mcqstutor Team 0 comments

The critical path in a CPM network diagram represents the sequence of activities having:

AMinimum duration
BMaximum total float
CZero total float and maximum duration
DIndependent float equal to activity time
Submitted by: mcqstutor Team 0 comments

The soundess of cement is tested to detect excess presence of:

AIron oxide
BFree lime and magnesia
CAlumina and silica
DGypsum content
Submitted by: mcqstutor Team 0 comments

In PERT, the duration of an individual activity is assumed to follow which probability distribution?

ABeta distribution
BPoisson distribution
CExponential distribution
DNormal distribution
Submitted by: mcqstutor Team 0 comments

Initial setting time of ordinary Portland cement (OPC) should not be less than:

A10 minutes
B60 minutes
C30 minutes
D600 minutes
Submitted by: mcqstutor Team 0 comments

The maximum permissible limit of fluoride in drinking water as per WHO guidelines is:

A3.0 mg/L
B0.5 mg/L
C1.5 mg/L
D5.0 mg/L
Submitted by: mcqstutor Team 0 comments

Self-cleansing velocity in a sanitary sewer pipe is maintained to prevent:

AProduction of toxic gases
BDeposition and settling of suspended solid matter
CBackflow into domestic connections
DExcessive scouring of pipe invert
Submitted by: mcqstutor Team 0 comments

Biochemical Oxygen Demand (BOD5) test is standardly measured after incubation at:

A10 degrees Celsius for 5 days
B37 degrees Celsius for 3 days
C25 degrees Celsius for 7 days
D20 degrees Celsius for 5 days
Submitted by: mcqstutor Team 0 comments

The main objective of adding alum during water treatment process is to act as a:

AFilter aid to increase pH
BDisinfectant to kill pathogenic bacteria
CSoftener to remove permanent hardness
DCoagulant to precipitate colloidal impurities
Submitted by: mcqstutor Team 0 comments